Analysis on Key Points of Quality Management of Housing Construction Engineering Supervision Site

VIEWS - 262 (Abstract) 14 (PDF (简体中文))
Yueming He

Abstract


In the development of the construction industry at this stage, with the acceleration of urbanization and the progress of construction technology, the scale and technicality of housing construction projects at this stage continue to improve, which has brought great challenges to the existing construction personnel. Staff members are easy to make mistakes in the operation link, affecting the quality of the building. Therefore, relevant personnel are required to carry out on-site supervision for construction projects and carry out construction quality control through various means. However, the construction project involves a wide range, and there are still some problems in quality management. This paper starts with the supervision site of housing construction project, and discusses the key points of quality management.



DOI: https://doi.org/10.26789/jzjg.v7i6.1565
Crossmark

Refbacks

  • There are currently no refbacks.


Cookies Notification